100-1 Car on road, construction shots, construction of Chrysler Plant, misc. shots of construction, Entry to Chrysler, shots in lathe facility, Kokomo Indiana plant (map of Indiana), misc. shots in plant (20:01 - 21:44) 100-2 Body panel press, rough finishing, body sanding (21:46 - 22:04) 100-3 conveyor, chassis line (22:04 - 22:27) 100-4 Chassis assembly, body assembly, body dipping, gutter trimming, body sealing, body painting, time data recorder, body sanding, wet and dry sanding, paint shop, drying paint, two tone finish, body storage (22:28 - 24:18) 100-5 Cab assembly (24:18 - 25:30) 100-6 Doghouse assembly (25:31 - 26:33) 100-7 Trim assembly (26:33 - 26:44) 100-8 Engine Installation (26:45 - 26:57) 100-9 Crankshaft line (26:58 - 27:14) 100-10 Dashboard Assembly (27:15 - 27:24) 100-11 Inner Trunk Assembly (27:25 - 27:36) 100-12 Small Parts Assembly (27:37 - 27:52) 100-13 Design Plant, engineers work on clay model, CUS of gears in gearbox (great) (27:55 - 31:00)